EC011645 versión 5
Concentrical connection set flue gas/air supply
- Publicada en
- ETIM-10.0
- También se llama
- Connection set boiler connection element for heat recovery unit, Connection set combiflow
Material (2)
| # | Feature | Tipo | Unidad | Valores permitidos |
|---|---|---|---|---|
| 1 | Material inner pipe | A | — | |
| 2 | Material outer pipe | A | — |
Operating conditions (1)
Measurements (1)
| # | Feature | Tipo | Unidad | Valores permitidos |
|---|---|---|---|---|
| 4 | Flue gas and air supply pipe diameter | A | — |
Connection (1)
| # | Feature | Tipo | Unidad | Valores permitidos |
|---|---|---|---|---|
| 5 | For connection boiler to heat recovery unit | L | — | — |